@bolt/components-critical-path

v0.9.6

Bolt Collection of Critical Path JS

MIT
Latest version published 4 years ago
    npm install @bolt/components-critical-path
  
We couldn't find any similar packages Browse all packages

Package Health Score

61 / 100

Security

No known security issues
Powered by Snyk
All security vulnerabilities belong to production dependencies of direct and indirect packages.

Security and license risk for significant versions

All Versions
Version Vulnerabilities License Risk
0.9.6 | 02/2018
Popular
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
0.2.0 | 11/2017
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
0.1.0 | 09/2017
  • 0
    C
  • 0
    H
  • 0
    M
  • 0
    L
  • 0
    H
  • 0
    M
  • 0
    L
License
MIT
Security Policy
No

Is your project affected by vulnerabilities?

Scan your projects for vulnerabilities. Fix quickly with automated fixes. Get started with Snyk for free.

# Install the Snyk CLI and test your project
npm i snyk -g && snyk test @bolt/components-critical-path
Get started free

Popularity

Limited

Weekly Downloads (1)

Download trend
Dependents
3
GitHub Stars
251
Forks
43
Contributors
40

Direct Usage Popularity


The npm package @bolt/components-critical-path receives a total of 1 downloads a week. As such, we scored @bolt/components-critical-path popularity level to be Limited.

Based on project statistics from the GitHub repository for the npm package @bolt/components-critical-path, we found that it has been starred 251 times, and that 3 other projects in the ecosystem are dependent on it.

Downloads are calculated as moving averages for a period of the last 12 months, excluding weekends and known missing data points.

Community

Sustainable
Readme.md
Yes
Contributing.md
No
Code of Conduct
No
Contributors
40
Funding
No

With more than 10 contributors for the @bolt/components-critical-path repository, this is possibly a sign for a growing and inviting community.

We found a way for you to contribute to the project! Looks like @bolt/components-critical-path is missing a Code of Conduct.


Embed Package Health Score Badge

package health: 61/100 package health 61/100

Maintenance

Inactive

Commit Frequency

Open Issues
2
Open PR
4
Last Release
4 years ago
Last Commit
7 days ago

Further analysis of the maintenance status of @bolt/components-critical-path based on released npm versions cadence, the repository activity, and other data points determined that its maintenance is Inactive.

An important project maintenance signal to consider for @bolt/components-critical-path is that it hasn't seen any new versions released to npm in the past 12 months, and could be considered as a discontinued project, or that which receives low attention from its maintainers.

As a healthy sign for on-going project maintenance, we found that the GitHub repository had at least 1 pull request or issue interacted with by the community.

Package

Node.js Compatibility
not defined

Age
5 years
Dependencies
1 Direct
Versions
51
Install Size
0 B
Dist-tags
4
# of Files
0
Maintainers
5
TS Typings
No

@bolt/components-critical-path has more than a single and default latest tag published for the npm package. This means, there may be other tags available for this package, such as next to indicate future releases, or stable to indicate stable releases.